Capital Projects & Facilities 

  • 2009 Bond

     
    The 2009 $42M Bond accomplished the following:
     
    MAJOR PROJECTS
    Wilkes Elementary School Replacement
    Transportation Modernization

    ESSENTIAL RENOVATIONS

    Bainbridge High School

    • Tennis court resurfacing
    • Fastpitch & baseball scoreboards
    • Breezeway roof replacement
    • Parking reconfiguration signage
    • Roof postpone patch & repair
    • Computer lab electrical upgrade
    • Waste reduction
    • Composite lab
    • Drafting room renovation
    • Math classroom “pilot” revision
    • Classroom lighting retrofit 
    • Photo lab renovation
    • Energy conservation (lighting upgrades)
    • Security camera upgrades
    • Records room filing system upgrade
    • Color coded parking signage 
    BHS Stadium
    • Energy conservation (lighting upgrades)
    • Sound system replacement
    Commodore Facility
    • Office remodel
    • Heat recovery unit installation 7/8 (partial steam system replacement)
    • Building Signage replacement
    • Classroom furniture
    • Lighting upgrade
    • Parking lot/asphalt improvements
    • Telephone/intercom upgrades
    • Educational Specifications

    Woodward Middle School

    • Field & track replacement
    • Commons paint and baseboard
    • Roof replacement
    • Gymnasium upgrade and floor replacement
    • HVAC programming upgrade
    • Exterior paint
    • Field drainage improvements
    • Library reconfiguration
    • Main office and interior doors paint and baseboards
    • Home & Family Life kitchen remodel
    • New storage shed on field 
    • Roof retrofit
    • Security camera upgrades

    Sakai Intermediate School

    • HVAC server upgrade
    • Interior paint
    • Music room acoustic improvements
    • Lighting retrofit
    • Gymnasium floor re-striping
    • Tack wall installations
    • Main entry solar light
    • SPED lighting
    • Coordination of Spacenet playground installation

     Blakely Elementary School

    • Roof postpone patch & repair
    • Science technology engineering & math (STEM) room conversion
    • Lighting retrofit
    • Portable move to Commodore

     Ordway Elementary School

    • Portable roof replacement
    • Science technology engineering & math (STEM) room conversion
    • Lighting retrofit
    • Play shed and playground improvements
    • Portables (2) relocation & upgrades (2015)
    • Portables (2) relocation & upgrades (2017)
    • HVAC improvements 
    • Library modifications and furniture
    • Special Education room improvements
    • New plumbing and drinking fountain fixtures
    • Exterior paint
    • New kindergarten roof and exterior painting
    • Patch and paint
    • Music room acoustics/improvements

    Wilkes Elementary School

    • Science technology engineering & math (STEM) room conversion
    • Entryway security vestibule

    District Administration Office

    • HVAC improvements
    • Retractable blackout blinds in board room
    • Reconfiguration/office modifications

    Capital Projects Districtwide

    • Security cameras
    • Energy conservation
    • Pavement improvements
    • Handheld emergency communication radios
    • Parking lot asphalt improvements and striping 
    • Security radios replacement